CHAITANYA BHARATHI INSTITUTE OF TECHNOLOGY (A)
  • G-Power Plant Engineering (CE-VI)-VII-2021-22
    0%
  • Previous
  • Course data
    General
    Announcements
    PPE - Unit wise questions (Question Bank)
    PPE - Complete Notes
    Slip test - 1
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211030-01-Remedial class-discussion on types of power plants, components and working of thermal (steam) power plant, ash handling and dust collection systems
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211106-02-Remedial class-discussion on types of stokers, pulverized coal burners and FBC in steam (thermal) power plants
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211120-04-Remedial class-discussion on the working of different types of nuclear reactors and radioactive waste disposal methods
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211127-05-Remedial class-discussion on power plant economics, depreciation, emissions from power plants and their control
    Course End Survey
    UNIT I & UNIT 2 INTRODUCTION, STEAM POWER PLANT, COMBUSTION PROCESS
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210803-1-Introduction to power plants, classification, selection of site and general layout of steam power plant
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210805-2- Working of steam power plant, formation and types of coal, various stages in coal handling in steam power plants
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210809-3- Systems of coal based steam power plant, coal handling equipment-working, advantages and disadvantages of belt conveyors
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210810-4-Screw conveyors, bucket elevators and grab bucket conveyors, disposal of ash and dust, layout of ash handling and dust collection system
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210812-5-Ash handling and dust collection systems-Mechanical, low pressure hydraulic, high pressure hydraulic, pneumatic and steam jet systems
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210816-6- Methods for burning of coal, stoker firing, classification of stokers, working of different types of overfeed and underfeed stokers
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210817-7-Pulverized coal burning-advantages and disadvantages, working of U-flame, short flame, tangential and cyclone coal burners
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210819-8-Fluidized be combustion (FBC)-benefits and disadvantages, discussion on questions given in previous exam question papers
    UNIT 3 HYDRO-ELECTRIC POWER PLANT
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210823-9-Hydr-electric power plant-various phases of hydrological cycle, hydrograph, flow duration curve, site selection for hydraulic power plant
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210824-10-Hydro-electric power plant-advantages and disadvantages, elements (flow-sheet), layout and working principle
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210826-11-Types of hydraulic power plants, working of high head, medium head, low head, base load, peak load, mini and micro hydel plants
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210830-12-Pumped storage hydro-electric power plants, storage and pondage, dams-different parts & terminologies, selection of site for dams
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210902-13-Construction and working of storage dams, diversion dams, detention dams, debris dams, coffer dams, trapezoidal dams and arch dams
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210903-14-Construction and working of stone masonry dams, concrete dams, steel dams, timber dams, earth dams, rockfill dams, gravity dams and buttress dams
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210906-15- Spillways-necessity, location, requirements, parts, types, working of overfall, chute, side channel, saddle, emergency, shaft and siphon spillways
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210907-16-Conventional and non-conventional power plants-steam and hydraulic power plants, discussion on the questions given in the previous exam question papers
    UNIT 4 NUCLEAR POWER PLANTS
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210909-17-Nuclear power plants-fission, radioactivity, fertile material, breeding fuel, distinction between fissionable, fissile and fertile
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210911-18-Nuclear fuel cycle-fuel mining, processing, enrichment, fuel fabrication, fuel burnup, cooling, storage of spent fuel and reprocessing
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20210911-19-Nuclear fuels-production, use, fuel assembly, advantages and disadvantages, nuclear power plants-advantages and disadvantages
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211004-20- PWR fuel, BWR fuel, CANDU fuel, Magnox fuel, nuclear power plants in India, nuclear reactor
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211007-21-Basic components, functions and working of nuclear reactor, working of Pressurized water reactor, Pressurized heavy water reactor and Boiling water reactor
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211009-22-Construction and working of Sodium-Graphite reactor and its advantages & disadvantages, Fast breeder reactor and Gas cooled reactor
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211011-23-Nuclear reactor safety-preventive and mitigating measures, radioactive waste-low-level waste (LLW), intermediate-level waste (ILW) and High-level waste (HLW)
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211014-24-Various radioactive waste management practices (handling, storage and legal disposal methods) followed in India
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211018-25-Nuclear waste storage and disposal problems, effects of nuclear waste in the ocean and impact on the environment
    UNIT 5 POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211021-26-Power plant economics-fixed cost-land, building, equipment, installation and overhead charges, depreciation cost and methods of depreciation
    AY2021-22-UG-SEM-7-PROD-18MEE21-PPE-DKK-20211023-27-Factors affecting depreciation, straight-line method and diminishing balance method of finding depreciation expense-numerical problems
  • Next
  CHAITANYA BHARATHI INSTITUTE OF TECHNOLOGY (A)
    • Log in
      Forgot Password?
    G-Power Plant Engineering (CE-VI)-VII-2021-22
    Home
    Skip to main content

    Course info

    1. Home
    2. Courses
    3. Mechanical Engineering
    4. UG
    5. AY -2021-22
    6. VII Semester
    7. G-Power Plant Engineering (CE-VI)-VII-2021-22
    8. Summary

    G-Power Plant Engineering (CE-VI)-VII-2021-22

    • Teacher: Dr.K.Kishor Associate Professor
    Skill Level: Beginner

    Follow Us

    Chaitanya Bharathi Institute of Technology(Autonomous), Hyderabad
    You are not logged in. (Log in)