CHAITANYA BHARATHI INSTITUTE OF TECHNOLOGY (A)
A2-VII-Construction Engineering and Management-2021-22
0%
Previous
Course data
General
Announcements
CE &M On-line classes Recordings
1. Course outcomes, Introduction to CM&E, and syllabus.
2.Staff Organization, Line &Staff Organization.
3. Construction, and Need for Construction Management.
4.Types of Projects, Organization, and start of Organization principles.
5.Organization Principles, Organization Types & Line Organization.
6. Construction Team
7. Completion of construction team, types of constructions, economy by Engr & resources of Construction Industry.
8. significance of CM, and Project delivery methods.
9. Project Phases
10. Completion of Project Phases and agencies of construction.
11.Project Planning and different types of plans- Time, man power, material and construction equipment plans.
12.Revision of types of plans, WBS and examples.
13. Gantt Charts & Limitations, Example problems on Gantt Charts.
14. Example problems on Bar charts, Network techniques-Basic terminology, CPM vs PERT, PERT time estimates, Variances & Basic rules for network development.
15. Project planning and its uses, Fulkerson rule of node numbering, errors in networks, constuction of network from precedence relationships and a numerical example.
16. Event & activity times-computation, Critical activities & critical path, slack and float.
17. Various types of floats, derivation of expressions for total, free, independent and interfering floats, Numerical problem on CPM.
18. solving of problems on drawing of Networks from precedence relationships and Critical path method (CPM).
19. PERT-need, time estimates, expected time,variance, probability of project completion by scheduled time and solving numerical problems.
20. UNIT-3 Project Monitoring & Control-Introduction, Monitoring, Supervision, Record keeping & periodic progress reports.
21. Monitoring &control system,10tips in moniroring & control, Updating plans-need, source for updation, Updating project using bar charts, and CPM/PERT network.
22. "Updating project using CPM/PERT-revision, and discussion on reseach paper on Site records-STEVE SCOTT & SAMI ASSADI (1999) A survey of the site records kept by construction supervisors, CM&E,UK. 17:3, 375-382. "
23. Precedence Network Method/Precedence Diagram Method (PDM)-Numerical Example.
24. Precedence Network Method/Precedence Diagram Method (PDM)-Repetition and solving of problem by students.
25. Time-Cost Trade off- need, direct cost, indirect cost, total cost, Time - Cost curve, Cost slope and steps in Time-cost tradeoff (Crashing of critical activity duration to otain Optimal cost & least cost network)
26. Numerical Problem on Time-Cost trade-off-Drawing least cost network & Optimum time-cost curve.
27. Continuation of working out Numerical Problems on Time-Cost trade-off, Updating using Precedence network method.
28. Updating by Precedence network method, UNIT-4: Construction safety-Introduction, significance, Causes of accidents, Losses of accidents-direct & indrect losses.
29. Causes and sorces of accidents, Preventive measures, and Personal protective equipment.
30. Activities & safety equipment, Costs of accident, H&S Acts, Quality, Inspection and Quality Control.
PPT/PDFs
UNIT-1 Study Material
Drive link for PPTs
Drive link for study material (All units)
Assignments
ASSIGNMENT-I
Assignment 2
Slip tests
Sliptest-1
Slip test 1 (Re-Exam)
Slip test 2
Slip test 2 (Re-Exam)
Topic 5
COURSE END SURVEY
Next
CHAITANYA BHARATHI INSTITUTE OF TECHNOLOGY (A)
Side panel
Log in
Username
Password
Remember username
Forgot Password?
Log in
A2-VII-Construction Engineering and Management-2021-22
Home
Skip to main content
Course info
Home
Courses
Civil Engineering
UG
AY - 2021-22
VII Semester
A2-VII-Construction Engineering and Management-2021-22
Summary
A2-VII-Construction Engineering and Management-2021-22
Teacher:
Dr.M.V.Krishna Rao Professor
Skill Level
:
Beginner